WP_Term Object
(
[term_id] => 19
[name] => Bathroom Conversion
[slug] => bathroom-conversion
[term_group] => 0
[term_taxonomy_id] => 19
[taxonomy] => gallery-category
[description] => Half bath converted into a full bathroom, toilet relocated, recessed lighting, bathtub installation, subway tiles installation and updated fixtures
[parent] => 9
[count] => 1
[filter] => raw
)
WP_Term Object
(
[term_id] => 18
[name] => Bathroom Renovation
[slug] => bathroom-renovation-3
[term_group] => 0
[term_taxonomy_id] => 18
[taxonomy] => gallery-category
[description] => Client wanted to update her old outdated bathroom that had leaking shower valve, crumbling walls and ceiling. Reglazed bathtub after grouting was completely dried.
[parent] => 9
[count] => 0
[filter] => raw
)
WP_Term Object
(
[term_id] => 22
[name] => Ceramic Tiling
[slug] => ceramic-tiling
[term_group] => 0
[term_taxonomy_id] => 22
[taxonomy] => gallery-category
[description] => New bathroom renovation with floor and wall tiles from the Tile Shop they have a huge selection to choose from.
[parent] => 9
[count] => 0
[filter] => raw
)